Search Results: 9 vacancies

 ...project. Qualification • MUST BE A LICENSE MECHANICAL ENGINEER. • WITH AT LEAST 3 TO 5 YEAR EXPERIENCE IN MECHANICAL DESIGN, ESTIMATION AND RELATED ENINEERING WORKS. • APPLICANTS MUST BE WILLING TO WORK IN SUBIC OR BE ASSIGN ON JOBSITE LOCATION, WHEN REQUIRED. •... 

KINDEN PHILS. CORPORATION

Subic, Zambales
8 hours ago
1. Study, evaluate, and analyze project design criteria and estimate requirements. 2. Prepare the basis of the design according to the design criteria of the client. 3. Prepare project design concepts related to mechanical work requirements. 4. Secure quotations from... 

KINDEN PHILS. CORPORATION

Subic, Zambales
8 hours ago
 ...construction inspections, quality control, and submittal reviews beyond the expertise of construction managers Develop cost estimates and time schedules, review and analyze preliminary and final designs, plans, and specifications for technical efficiency and adequacy... 

Planate Management Group

Olongapo
1 day ago
 ...review and approval) Ability to deliver complete design package which includes design drawings, technical specifications, cost estimates, schedule of works, and other related documents Working knowledge of local and international regulatory requirements and industry... 

Planate Management Group

Subic, Zambales
13 days ago
 ...essential to the project's success. Beyond general carpentry, responsibilities may include measuring, drafting plans, material sourcing, estimating, and conducting site visits. This is a 3-month project at the Subic Shipyard and the monthly salary is Php18,000.00. Key... 

Planate Management Group

Castillejos, Zambales
6 days ago
 ...Mechanical Engineering works. Key responsibilities: Design, and prepare detailed design drawings, project specifications, cost estimates, construction schedules, and other requirements needed for the proper implementation of the project. Carry out preliminary... 

Planate Management Group

Dinalupihan, Bataan
1 day ago
 ...of supplies like paint brushes, rollers, and tarps Removing old finish using scrapers, chemical compounds, or blowtorches Estimating time and material costs on painting projects Cleaning machines, equipment, and work areas using water, solvents, and other cleaning... 

Planate Management Group

Castillejos, Zambales
a month ago
 ...construction inspections, quality control, and submittal reviews beyond the expertise of construction managers Develop cost estimates and time schedules, review and analyze preliminary and final designs, plans, and specifications for technical efficiency and adequacy... 

Planate Management Group

Subic, Zambales
4 days ago
 ...Provides updates to the client on claims related issues and concerns • If necessary, provides the clients with the contacts of the estimator and who s/he needs to follow up in the repair • Proactively follows-up claims and management if claims TAT is not going to be... 
Olongapo
25 days ago